Tuesday, September 3, 2013

Wisconsin "Almost Passive House" One Year On...

South side of the cabin - seen from the woods

John and just got back to New York from a week out at the Wisconsin Cabin and it was AMAZING to see the house again. It weathered its first Wisconsin winter great (not that I ever doubted!) and looks terrific. We were able to button up the last few items that we didn't get to last season - finishing the deck, doing some painting and last bit of trim, commissioning the HRV, etc... - and it was fun to spend a few days road-testing the space.

South deck all finished up

The nice big deck has already seen some serious grill-testing and passed with flying colors. In addition, we were able to get some nice photos of the finished cabin - I'll post some of the interior as well once we have a chance to go through them but I thought I'd put up some shots of the exterior. We're trying to get better at our project photography - something incredibly important that often goes neglected as we rush to finish projects and button things up. the great folks over at Build Blog have written several good posts on the importance of architectural photos which we highly recommend. We're not by a long stretch great photographers, but we're certainly getting better. 

Interestingly, I've found our work on 'fake' architectural visualizations (Renderings) has been very helpful to our photography technique as all the same composition, lighting and story-telling rules apply to both mediums. 

At any rate, it was great fun to see the project again and a nice week to strap the tool-belt on for a little white. Enjoy the photos and I'll post the interiors soon.

South deck built-in benches with the lake in the background

Entry elevation - North side

Sunday, August 11, 2013

Foundation Thermal Bridging

One of the most difficult spots on any project is where the building meets the ground. On a Passive House where we strive to eliminate as many thermal bridges as possible this moment is especially fraught. The typical house detail (which usually include building a floor and then simply sitting the walls on top) is a massive thermal bridge and lead to huge energy waste as well as cold and uncomfortable areas inside. 

Wisconsin Cabin Double-Stud Foundation Detail: The ext. stud layer overlaps the floor , insulating the edge and reducing the thermal bridging of the floor framing members. 

Thermal Bridging?
In the building-science world we refer to a thermal bridge as some element (usually wood or steel) which is continuous from the conditioned interior of a building all the way to the outdoors. These 'Bridges' (from one side to the other of a wall/roof/floor) move heat from the warm side to the cold side (look at that: high school physics in action!) - so in the summer the gross heat outside is invading your nice AC'd interior and in the winter the warmth from your toasty wood-fire is being drawn out into the cold outside. 

No matter the season - you are wasting money and energy and increasing possibilities for discomfort when you have many bad thermal bridges in your building. In a typical home, there are LOTS of bridges; every stud, every rafter, every floor-joist, lots of electrical conduit and wires, plumbing pipes, HVAC ducts, Bolts and other fasteners, window frames, door thresholds and a thousand other spots all contribute to wasting energy in a building. 

So what can be done to reduce thermal bridges? Lots. Its not rocket science - it just takes attention and care during the design and detailing phase and an understanding of the principals of heat flow. 

Typical Foundation Details:
There are a LOT of factors that go into a foundation detail. First though are the code required sizes and configurations. Here in NY we can use several types of foundations - for this project though we are looking at two real options - a full stem wall and a slab on grade. 

The Stem wall needs to go down at least to the frost-line as defined by the local code inspector. Where we're building - that's 48", and then a spread footing at the bottom of the wall. Since there is no basement, the foundation slab is then poured on gravel which will allow for proper drainage as well as a continuous Moisture barrier. There are lots of good descriptions of these systems but the best are (as usual) the folks at BSC: 

The way the wall, foundation and floor all come together are crucial to the energy performance and this is often the weak link in even the best insulated walls.

A Really Good Foundation Detail:
On a Passive House we are very concerned with thermal bridges, and a lot of our decisions about our wall framing on these projects are driven by these sill-detail concerns (and the eaves too). We like the double stud a LOT because it allows us tons of freedom to create a full thermal separation between the interior slab (which will be at the interior air-temp) and the exterior Structural Foundation wall which is outside the thermal envelope and therefor will stay the temp of the outside air / ground.

Most PH projects feature a lot of Foam insulation underneath the foundation slab. Check out especially the Hammer and Hand folks here for a great example some great foundation work. So we initially drew up our detail using this technique - works pretty darn well - except that the local building inspector doesn't really like it and wants us to hire and engineer to assess the slab, though that's certainly not a big deal.

Below you can see the CAD detail on the left and a thermal bridge simulation on the right. The colors represent the temperature of the assembly from Interior (left - white) to exterior (right - black).

To asses our 2-D thermal bridges we use a simulation tool called THERM, and a huge thanks go out to David White from Right Environments for posting his amazing THERM tutorials for PHPP use - invaluable for anyone getting started in thermal bridge analysis.

A Really Good Foundation Detail: lots of Insulation under a concrete slab

You can see on this detail that we achieved a NEGATIVE thermal bridge of -0.0374 W/m-degK. Whats a negative thermal bridge? Well, because of the way we do our energy modeling in the Passive House spreadsheet, we can actually get a credit if our thermal bridges are designed well enough. These credits offset some of the heating / cooling demand in the house - so the bigger the negative number the better. 

An Even Better Foundation Detail:
Now -this is certainly unconventional - and I know lots of builders that might have a worry or two about this assembly. Admittedly, the fixing / fastening here is not quite worked out yet so if anyone has a suggestion please send it my way! But what we're proposing here is to move the insulation above the Typical concrete slab, then to install the wood floor on-top of that foam. This is pretty much a 'retrofit' detail that you might see on a basement or garage renovation like this. 

You can see here that when we use THERM to assess this detail, we get a negative thermal bridge of -0.0547 W/m-degK.

So quite bit better that the insulation underneath the slab. How much better? Well, with the first example (-0.0374 W/m-degK) our house would have an annual heating demand of 14.234 kWh/m2-a - now if we shift to this over-slab detail, we drop our heating demand to 13.868  kWh/m2-a.

That's a 0.4 kWh/m2-a (3%) drop in our yearly heating demand just by moving the location of the insulation in relation to the slab. I  know that sounds small - but to hit the PH standard every little bit is crucial) So not bad considering we didn't increase any material quantities and we might have even made our life easier (cheaper) since now the local building inspector doesn't need me to hire an engineer to keep him happy about the slab being poured on-top of the foam. 

Of course, there are moisture and constructability issues here  - but if we can seal under the slab well to prevent moisture from getting into the slab in the first place-  I think this detail could work quite well. We're testing quite a few different versions though in order to find just the right balance of constructabilty, thermal performance, moisture resistance + durability and especially cost.

An Even Better Detail - put the insulation ABOVE the slab




Friday, July 26, 2013

New Upstate-NY Passive House in the Works

Here at BLDGtyp we've been hard at work for the last few months on a beautiful new Passive House in Upstate NY. We've partnered with LEVENBETTS for the project, with they supplying their considerable design and architectural expertise, and BLDGtyp our Passive House and house building know-how. We'll be showing a lot more of the project over the next couple months as we move into construction, and we'll be discussing how we're meeting the Passive House standard as well.

The incredibly beautiful site

This new project will be two new buildings, one a single-family home and the other an Art-Studio. BLDGtyp is going after full Passive House Certification(!!) on the house and we've been working hard to design a home which balances the site characteristics, desires for views, patterns of use and all the other fun architect-y stuff with the super-insulation and passive solar heating. The house will be using beautiful full-height French windows which will be triple glazed to capture as much free solar heat as possible. 

House and Art-Studio Plans


Both buildings reference the traditional vernacular of this rural area with barns and simple farm-houses providing the architectural reference point. Contemporary details and materials though will create a project which carefully balances old and new. Wood siding on the house will contrast strongly with the standing seam-metal of the Studio, with both being topped by a simple metal roof. 

House + Studio Elevations

Like the simple, elegant form and detailing of the home, BLDGtyp has developed straightforward, yet highly effective details and assemblies for the home. We will be going with the double-stud framing similar to that used on our Wisconsin "Almost Passive House". We like this technique a lot for creating a very thick, thermally broken wall assembly that is VERY easy to build. After all - if you know how to frame one wall, just frame another one right ext to it. No special construction needed. 

Typical House Wall.:Slab on grade foundation with stem walls, super insulated wall and truss roof.

Of course, the devil is in the details and we still have a ways to go in developing our top and bottom details, as well as window and door details. Designing for a clean, contemporary look while maintaining strict thermal separation and avoiding thermally-bridging elements is no small task, even on small house like this one.


Typical Wall Top and Bottom Details


 We'll be posting much more about the project soon, so check back often. 





Friday, October 26, 2012

All Buttoned Up

North side on our last day in Wisconsin

Well we're all finished up for the season on our Wisconsin house. We had a blast spending the summer out here building and we're very happy with how everything has come out. There is still a small list of punchlist items and some exterior bits that will have to wait until the warm weather comes back in the spring. But the house is ready for some furniture and some big holiday meals!

East side with the bend.
The Kitchen finishes popped out of nowhere in the last couple days with the walnut doors going on, the countertops sealed and waxed and all the finish tile being set. I think it does just what we wanted by providing a central congregation space that still provides enough room to actually . . . you know . . . cook. The only thing missing from this main space is the stone around the fireplace which the clients want to tackle themselves as a fun summer project next year. 

Kitchen looking north-west (towards the lake)

Kitchen, looking south-east towards living space

Bedroom - all finished and ready for furniture

One of my favorite areas, and honestly a bit of a surprise, was the sleeping loft. The bend in the house gives the space a really unique and dynamic feeling while the big glassed-in gable ends provide tons of fantastic daylight. I think this is going to everyone's favorite hiding place and will provide a great semi-private space during big family events. 


Sleeping loft, top of the stairs 
In the north end of the loft, we built a half-height divider to carve out a 'sleeping nook' which will be semi-sheltered from the rest of the space. The divider shifts from pine paneling into walnut cabinetry and back again as it wraps around the space. And the morning light that comes in from the gable windows is incredible - I'm sure this'll be a great spot to wake up in.




Below you can see one of my favorite spots - the bend and the big north-facing windows with the 'sleeping nook' to the left. Very cool. 



So, overall a big success. The thermal performance and air-sealing strategy is working even better than we imagined, and we all had a blast spending the summer living and working in the beautiful north woods of wisconsin. Everyone at BLDGtyp is incredibly grateful to the owners for being such wonderful people to work with and for everyone else who helped us wrestle this project into shape. We're hopeful that his home will become a much-loved retreat for the family, their children and grandchildren for many many years to come. 






Sunday, October 14, 2012

Air Sealing: Step 04 - Performance Testing

Blower door in the front door
We did our final Blower-door testing today to verify our air-sealing strategy and the house performed far beyond our best estimates! Very exciting. 

Rich Urban from E3 Home Performance Services was nice enough to come out on a sunday morning to squeeze us in before we all head back to Brooklyn. He was really great to work with and walked us through the whole process and even let me play with his super-expensive IR scanner for a little bit! The Blower-Door is a test where a fan gets installed in an opening (usually a door) and the house is either pressurized or de-pressurized by blowing air in or out. This allows you to measure the amount of air moving through the cracks in the house's envelope, mechanicals and windows and to validate all our air-sealing work. 


Rich Urban, E3 Home Performance Services

Passive House specifies that a certified house should have an Air-Change Rate (how often all the air inside a house is changed to fresh outdoor air) of 0.6 Air-Changes every hour (when measured at 50 Pascals of air-pressure). We figured that since we didn't have Passive House windows and that we had some elements, like a big wood-stove and Range vent, these would make us a little leakier than we'd have liked.

0.6 Air Changes would mean roughly 250 CFM of air infiltration. We figured that we would be somewhere north of that, possible up around 400-500 CFM if there were some spots we really screwed up. But turns out we tested at only 175 CFM! (This was testing only the envelope though - when we opened the HRV ducts and the range vent we bumped up to about 250 CFM). But still a really great performance and a big success for the house. 

174 CFM at pressure
So that was all great news and we're very happy. During the test we walked through with Rich and took a look at all the details with his IR viewer. Since the house was depressurized, infiltration air would come leaking into the house through cracks and since there was a large temperature differential between outside and inside, we were able to see the cold air leaking in pretty well (what tiny amount there was). We could also see any thermal-bridging areas or spots where we had problems (there were only a tiny few).


IR view of a window sill. Black is cold, white is hot. The metal spacers in the Marvin windows show up as the dark line around the window. 

All in all - a big success.  Lately its been getting down into the 20s at night up here, but the house was always 55 when we came into work - even without any heat at all. So we certainly knew the house was performing very well, but it is still really exciting to see that proven by the test.


Friday, October 12, 2012

Concrete Countertops and Kitchen Finishes


concrete counter poured in a melamine form.
Its the last big weekend here. We've got a lot left to finish up - but we should be on schedule to be able to cook an inaugural dinner in the new house this sunday! Over the last couple weeks, we've been making our own custom concrete countertops for use in the kitchen, hearth and bathroom. After a bit of testing and planning we ended up pouring all the tops upside-down in melamine forms in order to give us a nice smooth finish. 


Above you can see Jason and Carrie vibrating a table full of the forms, we just used our cordless sawzalls without blades to get a constant vibration. The mix was a bit too dry in the end - so even with the vibration we still had some pockets and voids - but mostly it all worked really well.  

Carrie - troweling off one of the countertops

Kitchen counter, just after setting.
In addition to the kitchen and bathroom counters - there is a large built-in bench under the fireplace. This is made of a single huge concrete slab which sits on walnut fins. Below the gang is lifting it into place.


Jeremy, making nice on the bench right after pouring

To deal with the irregularities and voids, Carrie mixed up some special sauce and spent some time patching it up. Looks really nice now though. The first coat of sealer went on today - and over the next few days we'll apply a couple coats of beeswax finish and buff it to a beautiful sheen. 

Carrie finishing up the kitchen island.

Concrete counters on either side of the big farmhouse sink.

Besides the concrete, the kitchen Walnut paneling and doors are almost all on. It looks amazing contrasting with the pale pine walls and ceiling. Really dramatic, but still natural and together with the concrete it makes for a very strong looking kitchen.

Walnut panel

Installing cabinet doors

So, some more doors in the kitchen, a few more spots of pine on the walls, the bathroom door to install once the floor grout is done, and then after a bit of handle-installing and some baseboard we're just about wrapped up. Only 22 weeks in the making.












Sunday, October 7, 2012

Somedays Construction is a Lot of Fun . . .

 . . . and somedays you are putting up siding outside in the snow.

Ugg. 

Its been a pretty rough week: from digging holes for deck footings, to hauling concrete in 10 gallon buckets, to dealing with all the site garbage, shoveling dirt, then sanding 10,000LF of interior wood (including ceilings up over head) and staining said 10,000LF of interior wood (anyone who know me knows I HATE painting and staining), its pretty much been one bummer of a job after another. All, of course, capped off by this weekend of hanging siding on the garage in the snow on a day when the temperature barely got out of the 30s. Oh well - house building can't be all puppy-dogs ands rainbows after all. 

BUT things are really coming along. Only another week or so to go. We're outside this weekend because the last coat of Poly is drying on the new floors. The site work is all done, the decks and steps are all in, the floors and walls / ceilings are done and looking great. This week is tile, finish the kitchen cabinetry and add railings / handrails. Then punchlist and hopefully by next monday we're packing up to head back to brooklyn! Exciting. 

South Side deck. The hole is for a metal grate. Cuts down on leaks from snow buildup.

Mostly though its actually been incredibly beautiful here. Full fall fun. But right now I need to get to work, so I'll just leave you with some photos and a promise I'll add more soon. 

South side from the road. 
After site work, brought up the soil 14" all the way around. Looks much better now.


And all the lights are done inside.